Marches Biogas has several engineers qualified to work with full breathing apparatus and escape sets when undertaking work where there is likely to be a dangerous atmosphere. 

During 2017, the full breathing apparatus has been used on many occasions and across multiple sites for Dwr Cymru Welsh Water (DCWW).  As part of their statutory maintenance programme, DCWW commissioned Marches Biogas to carry out inspections of the digester pressure vacuum relief valves and gas holders to ensure plant safety. 

When inspecting pressure vacuum relief valves a full breathing apparatus is required to undertake the initial isolation of the valve. This initial work ensures the full inspection can be carried out safely and without the need for further use of breathing apparatus.  Where internal gas holder inspections were carried out, the engineer entering the gas holder was required to wear the full breathing apparatus throughout the inspection.

 

BACK TO CASE STUDIES

As part of their statutory maintenance programme DCWW ensure that the digester pressure vacuum relief valves and gas holders are regularly inspected to maintain plant safety.