Merrivale Energy Ltd Anaerobic Digestion facility was commissioned in 2015, exporting 500kWe to a neighbouring industrial user and utilising the heat from the CHP and the 190kWth boiler in a dryer used to dry woodchip and digestate fibre.
In 2016 Merrivale Energy Ltd commissioned Marches Biogas Ltd to design, install, build and commission a pasteurisation unit with its own dedicated 190KWth biogas boiler and heating system adjacent to the existing digester.
Once the installation was completed and fully commissioned, Marches Biogas Ltd then assisted Merrivale Energy Ltd with the process of applying for the digestate Quality Protocol and PAS110. The accreditation process was completed successfully with certification granted in July 2017.
‘The installation of the pasteurisation unit has allowed us to become accredited as producing digestate that is compliant with the Quality Protocol and PAS110 which allows us to market the digestate as a product. Marches Biogas guided us smoothly through the accreditation and certification process.’
Paul Chatterton, Managing Director Merrivale Energy Ltd
The installation of the pasteurisation unit has allowed us to become accredited as producing digestate that is compliant with the Quality Protocol and PAS110.
More Articles

Silo Headspace Safety Concerns
Marches Biogas specialises in anaerobic digestion engineering including gas safety. We have been working with a number…

Eign WWTW Digester Refurbishment
In January 2016, as part of a routine inspection one of the digester tanks at Eign WWTW was found to have damage to the …

AD Tank Contamination Test & Analysis
The research team at Marches Biogas have recently developed a new method for sampling and analysing the contamination levels…

Leeming Biogas Pipework
All mechanical design work undertaken by Marches Biogas is developed utilising full 3D modelling. The extensive use of 3D…